The table view lists the productivity for one or more presses in a selected period. The table view is the basis for all other productivity reports. Only times lying within the selected period of time are considered. Provided an operation starts, for example, before the defined period of time, the times before this period of time will not be evaluated.
Given value |
Note |
---|---|
Waste |
Waste sheets are both setup waste and production waste sheets. |
Speed index [14], time index [15] and quality index [16] |
The values given here are identical to the Productivity Report "OEE Index". For the calculation of each of the indices, see Calculation of the OEE indicators. |