Process

System behavior

Whether or not the Prinect Pressroom Manager generates a new job from the processed PPF/CIP3 files depends on the job number and sheet designation integrated in the PPF/CIP3 files.

IconNote.jpg

Note: A new job is usually only generated if the job number (from the PPF/CIP3 file) has not yet been created in the Prinect Pressroom Manager and the "Job attachment from PPF" option in the PPF import configuration has been enabled. If this option has not been acti­vated, manual intervention is necessary.

If several PPF/CIP3 files with the same job number but different sheet designations are generated by prepress, the Prinect Pressroom Manager merges them into one job.

So that you can understand the effects better, we have listed some practical cases in the table below.

Import of the PPF file from the prepress sys­tem:

Job ID already exists

Option "Job attachment from PPF" is activated.

Option "Job attachment from PPF" is deactivated.

1. PPF file is imported:

Job number: 01-0001

Sheet name: Sheet_1

No

The job is created automati­cally.

The job displays in the job list in "Jobs" and "Job Combiner".

The job is not created.

The PPF file displays in the "Unassigned jobs" section of "Job Combiner" and must be converted to a job manually.

2a. Another PPF file is imported:

Job number: 01-0001

Sheet name: Sheet_2

Yes

from the previous file.

The job is not created.

Because the PPF file has the same job ID as the PPF file before. The sheet "sheet_2" is automatically assigned to the job generated beforehand

Prerequisite: The "Define new sheets" option must be enabled in the general process settings.

 

2b. Another PPF file is imported:

Job number: 01-0002

Sheet name: Sheet_1

No

The job is created automati­cally.

The job displays in the job list in "Jobs" and "Job Combiner".

The job is not created.

The PPF file displays in "Job Combiner" and has to be con­verted to a job manually.

2c. Another PPF file is imported:

Job number: 01-0001

Sheet name: Sheet_1

Yes

from the import of the first PPF file.

The job is not created.

Case 1: The "Replace existing sheets" option is enabled in the general process settings. The existing sheet is replaced fully by the new sheet.