Jobs of the day

This page is accessible through drillthrough from several different pages and tiles in the report.

Pro_ProOverview_drill_joboftheday.png

 

Facts & Dimensions of the table:

•Job Number

•Net Volume

•Production Waste

•Avg Makeready Waste per Operation

•Avg Basic Makeready Time per Oper-ation (min)

•Avg Fine Tuning Time per Operation (min)

•Avg Transition Time A per Operation (min)

•Avg Transition Time B per Operation (min)

•Production Time (h)

•Operating Time (h)

•Net Productivity (1/h)

•Net Output (1/h)

 

Back to PRO - Production Overview

 

 

 

 

HD Privacy Statement  |  Imprint  |  Prinect Know How