Jobs of the day

This page is accessible through drillthrough from several different pages and tiles in the report.

Pro_ProOverview_drill_joboftheday.png

 

Facts & Dimensions of the table:

Job Number

Net Volume

Production Waste

Avg Makeready Waste per Operation

Avg Basic Makeready Time per Oper-ation (min)

Avg Fine Tuning Time per Operation (min)

Avg Transition Time A per Operation (min)

Avg Transition Time B per Operation (min)

Production Time (h)

Operating Time (h)

Net Productivity (1/h)

Net Output (1/h)

 

Back to PRO - Production Overview

 

 

 

 

HD Privacy Statement  |  Imprint  |  Prinect Know How