Job details

This page is accessible through drillthrough from several different pages and tiles in the report.

Pro_ProOverview_drill_JobDetails.png

 

Table of operations

Operation

Start Time

Device

Employee

Effective Processing Time (h)

Production Time (h)

Basic Makeready Time (h)

Fine Tuning Time (h)

Transition Time A (h)

Transition Time B (h)

Net Running Speed (1/h)

 

Table of materials

Material

Grammage

Width

Length

Net Volume per Operation

Net Running Speed (1/h)

Net Output (1/h)

 

Average make-ready and production waste per operation

Pro_ProOverview_drill_JobDetails_01.png

 

 

Facts & Dimensions:

Y-axis [units]: Avg Makeready Waste per Operation

Dots: Grammage

-axis [units]: Avg Production Waste per Operation

 

Back to PRO - Production Overview

 

 

 

 

HD Privacy Statement  |  Imprint  |  Prinect Know How