Privacy Policy | Imprint | Prinect Know How | Prinect Release Notes "Assigning operations" configuration step In this configuration step, you assign individual operations (PDC messages) to the previously selected operation groups (cost type groups). This assignment is necessary for each of the selected roles (operator, assistant or multiple operator). You can use the arrow keys to add or remove operations from the "assigned" list. After completing this configuration step, click on "Next".
Privacy Policy | Imprint | Prinect Know How | Prinect Release Notes


Note: An operation may only be assigned to one operation group.
Note: If you define more than 12 operations for each operation group, a message appears indicating that the Prinect CP2000 Center can display a maximum of 12 operations. You can then either confirm this message or reduce the number of operations to the maximum of 12.