Job details

(Change language of this page to: English, Deutsch)

This page is accessible through drillthrough from several different pages and tiles in this report. Right click on the job you want to examine and select "drillthrough".

Pro_Last10days_Key_JobDetails.png

 

On this page you can find all key information about the job in two tables. The first one lists the devices and operators (after drill down) that participated in the job. The second one lists the time types and the corresponding operations (after drill down).

It is possible to reach the following pages by drillthrough: Device jobs , Device jobs by Time Type and Operator jobs.

 

Facts & Dimensions:

Table of devices:

Device 

=> Drill Down: Employee

=> Drill Down: Time type 

Gross Volume 

Net Volume 

Waste Volume 

Waste (%) 

Waste Volume per Operation

Net Productivity (1/h) 

Net Output (1/h) 

Operating Time (h) 

Effective Processing Time (h) 

Production Time (h) 

Table of time types:

Time type

=> Drill Down: Operation

Gross Volume 

Net Volume 

Waste Volume 

Waste (%) 

Waste Volume per Operation

Net Productivity (1/h) 

Net Output (1/h) 

Operating Time (h) 

Effective Processing Time (h) 

Production Time (h) 

 

 

 

 

 

HD Privacy Statement  |  Imprint  |  Prinect Know How