(Change language of this page to: English, Deutsch)
This page is accessible through drillthrough from several different pages and tiles in the report. It shows you a table with the results for the make-ready time for each job that was performed on this day.
If you are not sure about the meaning of some of the measures, go to A brief explanation of important measures in this report.
You can use "drillthrough" again to see the details of each job.
Drillthrough:
Facts & Dimensions:
•Avg Basic Makeready Time per Oper-ation (min)
•Avg Fine Tuning Time per Operation (min)
•WashUp Time per 1000 Impressions (min)